
Chelladurai Boopathy
As the mind and the muscle behind AvEn, he possesses a rich knowledge and experience in the field of aviation fuel. He honed his expertise over 21 years of being a part of and leading technically challenging and demanding projects all over India and internationally – developing key strengths in Pipe Design and Engineering, Pressure Vessels, Project and Commercial Operations Management, Stress Analysis and Hydraulic Calculation among other skillsets. A few of his commendable experiences are managing an Aviation Fuel Hydrant System which involved the handling of multidisciplinary responsibilities and designing India’s longest Aviation Fuel Hydrant system spanning 15kms of underground piping. He has proven himself time and time again as a high functioning individual who thrives in demanding situations. He administered a team that handled three farm tank projects simultaneously and on another occasion a team handling four concurrent offshore projects, both of which he successfully saw to completion within the allotted timeframe.
- Delhi International Airport Terminal 1 – New Delhi. INDIA
- Hyderabad International Airport – Hyderabad. INDIA
- Bangalore International Airport – Bangalore. INDIA
- Dublin International Airport (DAA) Fuel Farm – Dublin, Ireland
- Luxembourg International Airport P7 Project – Findel, Luxembourg
- Chonburi Terminal (Q8) – Thailand
- Singapore Changi Terminal 4 (SER – South End Reservoir) – Singapore
- St. Helena Airport(Atkins) – St. Helena
- Singapore Changi 500/600 Series aircraft stands – Singapore
- Singapore Changi Code C Aircraft parking stands – Singapore
- Abu Dhabi International Airport (ADAC) Hydrant System – UAE
- Nay Pi Taw (Fuel Farm) NPT– Myanmar
- Delhi International Airport Terminal-3 (Hydrant System) DIAL – New Delhi, INDIA
- Salalah International Airport – Tendering. Muscat.
- Mumbai International Airport (Hydrant System) MIAL – Mumbai, INDIA
- D12 & Laila Offshore Field Development Project, Malaysia
- F14 & F29 Offshore Field Development Project, Malaysia
- Missan Oil Field Development, Iraq
- Ningxia Pipeline Project, China
- Zhuhai LNG Project Phase -1, China
- Myanmar – China Gas Pipeline Project, Myanmar
- West Qurna Phase II-Iraq
- Woodlands LOBP Upgrade, Singapore
- PNG & LNG Gas Metering Skid, Singapore
- Transfer of 1,3 Butadiene from Asahi to Vopak, Singapore
- Singapore Parallel Train (SPT) Olefins Recovery Project, Jurong Island, Singapore
- Shell Sarawak Berhard – Miri, Malaysia
- CNOOC, China
- CPMC (China Petroleum Materials Corporation), China
- Zhuhai LNG, China
- South East Asia Pipeline Co. Ltd., Myanmar
- LukOil/SOC, Russia/Dubai , United Arab Emirates
- Shell Eastern Petroleum Limited, Singapore
- Sembcorp Industries, Jurong Island, Singapore
- Exxon Mobil Chemical, Singapore
- Q8 Petroleum, Thailand
- Changi Airport Fuel Hydrant Installation (CAFHI) – Singapore
- Larsen & Toubro Ltd (Buildings & Factories), Hyderabad, India
- Larsen & Toubro Ltd (Transport & Infrastructure), New Delhi
- Dublin Airport Authority (DAA), Ireland
- Luxembourg Airport – Luxembourg
- ADAC (Abu Dhabi Airport) – Abu Dhabi, United Arab Emirates
- DIAL (Delhi International Airport Limited); GMR Private Limited, India
- MIAL (Mumbai International Airport Limited); GVK Private Limited, India
Chellakumar Balaraman

